Ginlong 10kW three phase wind inverter, pitch controller and other electrical equipments were instal

Autor: Hora:2016-01-07 13:42:22.0 Páginas vistas:1527

Ginlong 10kW three phase wind inverter, pitch controller and other electrical equipments were installed in the middle coastal area of Zhejiang province, incorporated into the wind turbine system of DaMuWan new town in XiangShan county - the so called “sea & mountainous fairyland, Oriental immortal island”, the whole system adopted GCI-10K-W inverter, GCB-20K controller and GPC-01 pitch controller.




0
Todos los comentarios (0):
+ Más

Noticias recomendadas

Copyright @ 2019 Ginlong Technologies Todos los derechos reservados
Captcha*