Key Takeaways
● The retrofit configuration is determined by two factors: whether the existing PV inverters are Solis units and whether the site has export-limitation or power-control requirements.
● Compatible Solis grid-tied PV inverters can communicate with the storage system via RS485. For third-party PV inverters, PV feeder power can be monitored through meters.
● The control approach differs between an existing Solis EPM system and a third-party export-control system. These two cases should not be treated as interchangeable.
● Zero Export is an export-control operating mode; it should not be interpreted as a guarantee of zero reverse power at every instant.
● A reliable business case should be based on the site's actual operating data, electricity tariffs and grid-export settlement arrangements.
1. What Are the Two Main Challenges in an Existing PV Retrofit?
1.1 Limited coordination between the existing PV system and the new BESS
When the existing PV system and the newly installed battery energy storage system operate independently, PV generation, site load, battery power and grid power may not be monitored and controlled as one integrated system. Some conventional configurations require separate data loggers or an external energy management system (EMS), adding communication links and commissioning work.

Figure 1. A typical arrangement in which the existing PV system and the new storage system lack integrated monitoring and coordination.
1.2 Multiple rooftops and connection points make site-wide monitoring more complex
Factories and farms may have multiple PV inverters installed on different buildings. Each PV system may connect locally to the AC distribution network before the feeders converge at the site's main point of common coupling (PCC). To assess PV self-consumption, grid exports and battery operation accurately, the metering locations and site-wide measurement boundaries must be clearly defined.

Figure 2. Typical system topology with multiple PV sources, site loads, the grid and energy storage.
2. How Do You Select the Right Connection Scenario?
The first step is to identify the existing PV inverter brand. The second is to confirm whether the site is subject to export limitation or power-control requirements. Together, these two factors define four typical retrofit scenarios.

Scenario 1: Solis PV Inverters Without Export Limitation
The existing PV system consists of one or more Solis grid-tied PV inverters, and the site is permitted to export surplus electricity without an export-power limit. After SolisStorage EverCore C&I ESS is added, the storage system can communicate with compatible Solis PV inverters via RS485 to acquire inverter operating data. The integrated EMS can then coordinate PV generation and battery operation.
The key benefit of this configuration is inverter-level data acquisition and coordinated energy management, potentially reducing the need for separate data loggers or external control devices. Actual compatibility depends on the PV inverter model, communication protocol and firmware version.

Figure 3. Existing PV system using Solis grid-tied inverters.

Figure 4. Retrofit configuration using RS485 communication for coordinated PV and storage operation.
Scenario 2: Solis PV Inverters with Existing Export Limitation
The existing Solis PV system uses an EPM (Export Power Manager) for export limitation or power control. Under the specified retrofit topology, the newly installed EverCore system acquires data from the Solis PV inverters via RS485. The storage inverter then takes over the system-level export-control function, replacing the existing EPM.
The purpose is to establish a unified control authority and avoid conflicting commands from the existing EPM and the storage system. Before implementation, the installer should verify the PCC metering arrangement, communication compatibility and applicable grid-connection requirements. EPM replacement is specific to this topology and should not be assumed to apply to every existing installation.

Figure 5. Existing Solis PV system with EPM-based export limitation.

Figure 6. Retrofit configuration in which the storage inverter takes over system-level export control.
Scenario 3: Third-Party PV Inverters Without Export Limitation
Where the existing PV system uses non-Solis inverters and is not subject to export limitation, meters can be installed to monitor the power of the individual PV grid-connection feeders. EverCore can use the metered data for site-wide energy monitoring.
In this configuration, the system supports data acquisition from up to six meters. The energy interface displays aggregated PV generation power, while the device interface can show the power and energy readings from each meter separately.
When PV generation exceeds on-site demand, the storage system can use the monitored power flow to charge the battery with available surplus PV energy, subject to battery state of charge, charging limits and the configured operating strategy.

Figure 7. Existing PV system using third-party grid-tied inverters.

Figure 8. Retrofit configuration using meters to monitor individual PV feeders.
Scenario 4: Third-Party PV Inverters with Existing Export Limitation
This scenario requires particular attention to control boundaries. The existing third-party PV system normally has its own export controller for reverse-power prevention or export limitation. After EverCore is added, meters are used to monitor the PV feeders, while the storage system is coordinated with the existing control architecture to support battery charging without undermining the site's export-control requirements.
The existing third-party export controller should not be removed by default. Its control scope and interaction with the storage system must be clearly defined during system design and commissioning.
Where the site allows a small amount of grid export, the storage inverter can be configured in Zero Export mode. When an export trend is detected, the system adjusts its charging power according to the configured control strategy.
For projects with stricter zero-export requirements, an initial power import setting of 0.5% of the storage inverter's total rated power can be used as a commissioning reference. If export power fluctuates, the setting can be adjusted in increments of approximately 0.1%, based on observed site behaviour. The aim is to maintain stable export control without causing unnecessary grid imports.
Zero Export is a control mode; it does not guarantee that reverse power will never occur at any instant. The 0.5% initial setting and 0.1% adjustment increment are reference values for commissioning, not universal settings. Final values must be determined according to the equipment configuration, metering accuracy, control response and local grid requirements.

Figure 9. Existing third-party PV system with its own export-control arrangement.

Figure 10. Retrofit configuration coordinating the storage system with the existing third-party export controller.
3. How Do the Four Scenarios Differ in Data Acquisition and Control?

4. How Should the Value of a Storage Retrofit Be Quantified?
A viable retrofit must satisfy both technical integration requirements and the project's economic objectives. On the equipment side, the assessment can consider whether the solution reduces the need for separate EMS hardware, data acquisition devices or additional commissioning work. On the operational side, the business case should be based on surplus PV energy, self-consumption, time-of-use tariffs and demand charges.
A project-specific financial model should include the initial equipment and installation investment, the amount of PV energy that can be shifted, round-trip efficiency, electricity tariffs, demand charges, operation and maintenance costs, battery degradation and actual system availability. For sites with multiple PV feeders, integrated monitoring can also help establish a clearer baseline for comparing energy flows before and after storage installation.
5. Romania C&I Project: Retrofitting Storage While Retaining Existing PV Inverters
A commercial and industrial (C&I) solar PV project in Romania was originally equipped with two 110 kW and one 50 kW grid-tied inverters. The project was retrofitted with two SolisStorage EverCore C&I ESS units, each rated at 125 kW / 261 kWh. Through RS485 communication, the system collects operating data from the existing Solis grid-tied inverters, enabling centralized monitoring of the integrated PV and energy storage system.
The project illustrates how energy storage can be integrated into a multi-inverter PV installation while retaining the existing grid-tied PV inverters. The project's actual financial benefits should be evaluated using its operating records and electricity settlement data.

Figure 11. Energy storage equipment installed at the Romania C&I project.

Figure 12. Existing PV inverter installation at the project site.
Frequently Asked Questions
Q: What is the main difference between integrating Solis and third-party PV inverters with storage?
A: Compatible Solis PV inverters can provide operating data to the storage system via RS485. For third-party PV inverters, meters are generally used to monitor the power of the PV grid-connection feeders.
Q: Do all existing export controllers need to be removed?
A: No. Under the specified Solis EPM topology, the storage inverter takes over the export-control function. In third-party PV systems, the existing third-party controller should be retained and its control boundaries coordinated with the storage system.
Q: How many third-party PV meters can the solution monitor?
A: In this configuration, the system supports data acquisition from up to six meters. Meter compatibility and the available number of inputs depend on the applicable product model and system version.
Q: Does Zero Export guarantee that no power will ever flow back to the grid?
A: Not necessarily. Metering, communication and control response all affect actual operation. Projects with strict export restrictions require site-specific commissioning and verification against local grid requirements.